top of page
underside-panoramic-perspective-view-steel-blue-glass-high-rise-building-skyscrapers-busin

Representative Projects

Asan Bay Bridge on the double-track Seohae Line

Location: Asan -si, South Chungcheong Province – Pyeongtaek-si, Gyeonggi Province

Construction: DL E&C

Total bridge length: approximately 5.999 km

Structure: Steel-reinforced concrete and steel bridge

Concrete conveying:

1.2km horizontal demonstration

Concrete:

Underwater fire resistance 35 MPa

Piers and abutments 45, 35 MPa

bottom of page