top of page

Representative Projects
Asan Bay Bridge on the double-track Seohae Line
Location: Asan -si, South Chungcheong Province – Pyeongtaek-si, Gyeonggi Province
Construction: DL E&C
Total bridge length: approximately 5.999 km
Structure: Steel-reinforced concrete and steel bridge
Concrete conveying:
1.2km horizontal demonstration
Concrete:
Underwater fire resistance 35 MPa
Piers and abutments 45, 35 MPa

bottom of page


